PROJECT
STANDARDAERO IN THE USA
CLIENT
STANDARDAERO
TEXAS,
UNITED STATES
PROJECT ENGINES
J85 TURBOFAN ADDITION TO AN EXISTING TEST FACILITY
THE PROJECT
CEL Aerospace was chosen to upgrade an existing test cell to add a J85 turbofan. CEL delivered four engine test adapters designed to interface with the existing thrust frame adapter. This was accomplished all while staying as cost-effective as possible by reusing existing/refurbishing equipment.